Case Study: Transmission Final Test |
||
|
|
Overview: |
|
A global power train manufacturer sought a turn-key transmission
final test equipment solution that could be implemented in several
manufacturing sites around the world. In addition to providing the
best technical solution and price, the successful supplier had to be
able to support this global program at several sites in both the
eastern and western hemispheres. Assembly & Test Worldwide (ATW)
successfully met this challenge by designing and building the most
robust, dependable, and flexible transmission final test systems
possible. These final test systems are being fully supported by ATW
facilities in the China and North America. Additional support could
also be provided by ATW facilities in India, Europe, and South
America.
|
||
|
Values & Benefits: |
||
|
||
Return to
Case Study Index |
||
Solution: |
|
Highlights: |
|